ISO 9001:2015 and ISO 14001:2015 Certified
This Website Complies With WCAG 2.2 Level A & AA Accessibility Standards
Supply, installation, testing, commissioning and training of Electrical, Fire protection and VAC works for 18 elevated Stations from PowerHouse Stations to Poonamalle Bypass station including Viaduct between the stations (Ch 10027.102 to Ch 25928.186), approach Ramp, including Poonamallee Depot for Corridor 4 of Chennai Metro Rail Project Phase-II