ISO 9001:2015 and ISO 14001:2015 Certified
This Website Complies With WCAG 2.2 Level A & AA Accessibility Standards
Design, manufacturing, supply, installation, testing, training and commissioning of RSS, ASS, SCADA, OHE & Switching Stations for CMRL Phase II – Corridor 4 (From Poonamallee Bypass to Lighthouse, including Depot at Poonamallee)