ISO 9001:2015 and ISO 14001:2015 Certified
This Website Complies With WCAG 2.2 Level A & AA Accessibility Standards
Design, Manufacturing, Supply, Installation, Testing, Training and Commissioning of RSS, ASS, SCADA, OHE, Switching Station for CMRL Phase II – Corridor 3 (From Sholinganallur to Sipcot 2) and Corridor 5 (From Puratchi Thalavi Dr.J Jayalalitha CMBT Metro)”