ISO 9001:2015 and ISO 14001:2015 Certified
This Website Complies With WCAG 2.2 Level A & AA Accessibility Standards
Design and Construction of Metro Station Entry/Exit Structures Integrated with Commercial Spaces and connecting through Link Bridge at Sholinganallur and Thoraipakkam Station including Civil, Plumbing, E&M, HVAC, Architectural Finishes and all associated works