Home »
Design and Construction of Metro Station Entry/Exit Structures Integrated with Commercial Spaces and connecting through Link Bridge at Sholinganallur and Thoraipakkam Station including Civil, Plumbing, E&M, HVAC, Architectural Finishes and all associated works
Design and Construction of Metro Station Entry/Exit Structures Integrated with Commercial Spaces and connecting through Link Bridge at Sholinganallur and Thoraipakkam Station including Civil, Plumbing, E&M, HVAC, Architectural Finishes and all associated works