Construction of a Paid-to-Paid Skywalk Link Between CMRL Phase-I and Phase-II Vadapalani Stations
08/05/2025
Open e-tender single stage-Two bid system
M/s Kousic & Co.,
8,12,62,100/- (Excluded GST)
16/07/2025
Civil
CMRL/CP/TDR-37-CS/2025
Consultancy Assignment to Prepare a Detailed Feasibility Report (DFR) for the Coimbatore-Tirupur-Erode-Salem Regional Rapid Transit System (RRTS) Corridor
26/03/2025
Open e-tender single stage-Two bid system
M/s Balaji Railroad System Private Limited
74,78,800/- (Excluded GST)
27/06/2025
Civil
CMRL/CP/TDR-36-CS/2025
Consultancy Assignment to Prepare a Detailed Feasibility Report (DFR) for the Chennai-Kanchipuram-Vellore Regional Rapid Transit System (RRTS) Corridor.
26/03/2025
Open e-tender single stage-Two bid system
M/s Balaji Railroad System Private Limited
72,88,000/- (Excluded GST)
27/06/2025
Civil
CMRL/CP/TDR-35-CS/2025
Consultancy Assignment to Prepare a Detailed Feasibility Report (DFR) for the Chennai-Chengalpattu-Tindivanam-Villupuram Regional Rapid Transit System (RRTS) Corridor
26/03/2025
Open e-tender single stage-Two bid system
M/s Balaji Railroad System Private Limited
74,78,800/- (Excluded GST)
26/06/2025
Civil
CMRL/CP/TDR-34-CS/2025
Consultancy Assignment for the Preparation of a Detailed Project Report (DPR) for introducing Mass Rapid Transit System from Tambaram to Guindy via Velachery as a part of Chennai Metro Rail Limited Network
26/03/2025
Open e-tender single stage-Two bid system
M/s Systra MVA Consulting (India) Pvt. Ltd.
96,19,000/- (Excluded GST)
19/06/2025
Civil
CMRL/CP/TDR-40-CON/2025
Design, Supply, Fabrication and Installation of Signages at Poonamallee Depot for Chennai Metro Rail Limited Phase-II
12/04/2025
Open e-tender single stage-Two bid system
M/s Neurotronix Systems India Private Limited
41,91,828.62 (Excluded GST)
13/06/2025
Civil
CMRL/CP/TDR-33-CS/2025
Consultancy Assignment for Preparing a Detailed Project Report (DPR) to introduce a Mass Rapid Transit System (MRTS) from Lighthouse to High Court via Secretariat as an Extension of Phase–II of the Chennai Metro Rail Network
26/03/2025
Open e-tender single stage-Two bid system
M/s Systra MVA Consulting (India) Pvt. Ltd.
38,20,000/- (Excluded GST)
13/06/2025
Civil
CMRL/CON-31/MTC-TVR/2025
Design and Redevelopment of Bus depot & facilities at Thiruvottiyur for Metropolitan Transport Corporation (MTC) as part of Multi-modal integration of CMRL Phase-I extension project
05/02/2025
Open e-tender single stage-Two bid system
M/s Elite Contractors Pvt. Ltd.
13,83,30,296/- (Excluded GST)
15/05/2025
Civil
CMRL/P&D/CON/MMFC-KR-04R/29/2025
Design and Construction of Civil, Structural, Architecture, MEP, VAC, Lifts, Escalators, Landscaping and Associated Works for Integrated Development of Multimodal Facility Complex with Kuralagam at Broadway, Chennai
14/01/2025
Open e-tender single stage-Two bid system
M/s Bridge & Roof Company India Ltd.
566,59,89,000/- (Excluded GST)
02/05/2025
Civil
CMRL/TDR-CON-32/C4-DPT-01-BW-04/2025
Landscapping/ Horticulture works including related Civil, Electrical, Irrigation and Associated Works at Poonamallee Depot