Preparation of Detail Project Report (DPR) for Property Development including feasibility, market analysis, transactional advice, concept plans, land use report with submission of documents to CMDA/GCC forapproval and Tender Documents for land parcel along viaduct near Thirumangalam Metro Station, Chennai
Design, Manufacturing Supply, Testing, Commissioning, Maintenance and Operation of a Self-Propelled Rail-Grinding Machine of Minimum 8 Stones Module
Preparation of Detail Project Report (DPR) for Property Development including feasibility, market analysis, transactional advice, concept plans, land use report with submission of documents to CMDA/GCC forapproval and Tender Documents for standalone land parcels near Metro Stations of Corridor-3, CMRL, Phase-2
Preparation of Detail Project Report (DPR) for Property Development including market analysis, transactional advice, land use report and Tender Documents for integrated land Parcels at Metro station entry/ exit in Corridor-3 &5, CMRL Phase-2
Design and Construction of Telephone Exchange building for BSNL and Cattle Feed Production Building for Co-Op Society at Poonamallee Chennai- (Civil & MEP Works)
Comprehensive LED Lighting Solution for Improved Visibility and Sustainability
Preparation of Detailed Project Report (DPR) for introducing Mass Rapid Transit System between Poonamalle and Parandur as part of Chennai Metro Rail Limited network
Preparation of Detailed Project Report (DPR) for introducing Mass Rapid Transit System between Koyambedu and Avadi as part of Chennai Metro Rail Limited network
Construction of Road and Drain for a Length of Approximately 2.0 Km outside Poonamallee Depot Boundary
Construction of Civil, Architectural, MEP & Allied Works in 12th floor of MetroS Building in Nandanam, Anna Salai, Chennai
Design, Supply, Installation, Testing, and Commissioning of LED Backlit LCD Based Dynamic Route Map Display System in the Existing 52 Trains of CMRL
Design Manufacture Supply Installation Testing and Commissioning of Heavy-Duty Machine Room Less Lifts Escalators and Travelators for CMRL Phase II Corridor3&5 (From Sholinganallur Lake I to Siruseri Sipcot II and Koyambedu Market to Elcot Park metro).
Design, Manufacture, Supply, Installation, Testing & Commissioning of Telecommunication System for Corridor 3 (Madhavaram Milk Colony to Sholinganallur) and Corridor 5 (Madhavaram Milk Colony to Koyambedu Metro) Of CMRL Phase II, including Depot at Madhavaram
Design, manufacture, Supply, Installation, Testing & Commissioning of Platform Screen Doors for Corridor 3 (Madhavaram Depot Metro to Tharamani Metro) and Corridor 5 (Kolathur Junction Metro to Villivakam MTH road Metro) of CMRL Phase II
Design, manufacture, Supply, Installation, Testing & Commissioning of Platform Screen Doors for Corridor 3 (Madhavaram Depot Metro to Tharamani Metro) and Corridor 5 (Kolathur Junction Metro to Villivakam MTH road Metro) of CMRL Phase II