Contract awarded for CMRL/PHASE-II/SYS/CP20.1/PS-06/2021 “Design, Manufacturing, Supply, Installation, Testing, Training and Commissioning of RSS, ASS & SCADA for CMRL Phase II – Corridor 3 (From Madhavaram Milk Colony to Sholinganallur) and Corridor 5 (Madhavaram Milk Colony to CMBT, including Depot at Madhavaram)” for Rs.533.87 Crores to M/s. Larsen & Toubro Limited.