Chennai Metro Rail Limited
Photo Gallery
-
Chennai Metro Rail Pavilion awarded third place in the State Government undertaking pavilion at the 47th TTDC Fair, 2023
-
Extended Parking facility opened at the Nanganallur Road Metro Station
-
The “Design, Manufacture, Supply, Installation, Testing & Commissioning of Signalling, Train Control and Video Management System” for the Phase -2 of Chennai Metro Rail Project has been awarded to the consortium of Hitachi Rail STS SPA and Hitachi Rail STS India Pvt Limited at a cost of INR 1,620 Cr.
-
The selection committee inspected the MetroS replica model exhibited as the CMRL pavilion at the ongoing 47th Tamil Nadu Tourism Development Corporation at Island Grounds in Chennai.
-
Chennai Metro Phase 2 Depot Machinery and Plant for Poonamallee Depot – Agreement signed between M/s. Chennai Metro Rail Limited and M/s. Swastik-EquiLavaggi Joint Venture
-
Madhavaram Metro Train Depot being constructed at a cost of Rs.284.51 crore
-
International Women’s Day celebrations held at CMRL Admin Building
-
Cultural Festival at Central Square & Gift Vouchers and Rewards distributed to the 30 winners of Lucky Draw by Thiru. Rajesh Chathurvedi, Director (Systems and Operations), CMRL
-
Tunneling commenced at Greenways Road Station in Corridor 3 contract TU02 Kellys to Taramani) of Phase –II Chennai Metro Rail Project, Today (16/02/2023)
-
Metro Connect: Last Mile Connectivity Facility between Arignar Anna Alandur Metro and DLF Cybercity, Porur