Phase 2-Corridor-3 (DDC Package No- P2C3/02)- “Engagement Of Detailed Design Consultant (DDC) for the Works and Services of the Detailed Design and Drawings for the Alignment, Civil & Structural, Architectural, Track Works, MEP, TVS & VAC covering the Alignment and Underground Stations from Thousand Lights to Taramani Road Junction (excluding Thousands Lights UG station) and Alignment, Ramp & Elevated Stations from Nehru Nagar to Sholinganallur ( CH:15742 to CH:35,414) in corridor 3 of Phase- II of Chennai Metro Rail Project”