Phase 2-Corridor-3 (DDC Package No- P2C3/01)- “Engagement of Detailed Design Consultant (DDC) For the Works and Services of the Detailed Design And Drawings for the Alignment, Civil, Structural, Architectural, MEP, TVS, VAC & Track Works covering the Alignment and Underground Stations from Madhavaram Milk Colony to Thousand Lights CH:(-)383 to CH:15742” in Corridor 3 of Phase- II of Chennai Metro Rail Project”.